On 06/04/2015 09:44 AM, Pete Ashdown wrote:
The SLIX switch at Level3 Delong will be placed on UPS
tonight, as well
as the UTOPIA-IX connection upgraded to 10Gb. This will occur at 3AM.
Any Level3 Delong connected peers will see an interruption.
We ran into a problem and didn't execute this upgrade. I'll notify when
we attempt again.